Skip to main content Skip to main menu Skip to footer

Search

Help

385 - 396 of 419
  • Article from 19.05.2022 | Last changed: 06.06.2024

    The Mining Code of the ISA

    … comparable set of regulations for exploitation projects is still missing. In summer 2017, the ISA Secretariat presented the " First Draft Exploitation Regulations ". By … comparable set of regulations for exploitation projects is still missing. In summer 2017, the ISA Secretariat presented the " First Draft Exploitation Regulations ". By …

  • Article from 06.06.2025 | Last changed: 06.06.2025

    Soil loss by wind erosion

    Soil displacement due to wind erosion near Worin in Brandenburg, Germany

    … clouds form that lead to massive visibility obstructions ( Wurbs and Steininger 2017 ). What facilitates soil loss by wind erosion? The extent of soil loss by wind … clouds form that lead to massive visibility obstructions ( Wurbs and Steininger 2017 ). … The extent of soil loss by wind depends regionally or locally on natural, …

  • Article from 30.05.2025 | Last changed: 15.07.2025

    Soil loss by water erosion

    Figure 2. Potato dams in the downslope direction force soil loss by water.

    … (2019): Mean annual precipitation erosivity (R factor) based on RADKLIM Version 2017.002 ,  Gebel, M.; Allion, K.; Plambeck, N. O.; Fuchs, S.; Ullrich, A. (2021): … (2019): Mean annual precipitation erosivity (R factor) based on RADKLIM Version 2017.002 ,  Gebel, M.; Allion, K.; Plambeck, N. O.; Fuchs, S.; Ullrich, A. (2021): …

  • Article from 03.12.2025 | Last changed: 03.12.2025

    European Earth Observation Programme Copernicus

    Sentinel-2 RGB satellite image of Dessau-Roßlau (date of recording: June 21, 2020), overlaid with the data product “Riparian Zones” (reference year 2012), provided by the Copernicus Land Service.

    … Cabinet adopted the “National Strategy for the European Copernicus Programme” in 2017. This strategy was updated in 2024 with the „ National User Uptake Strategy for … Cabinet adopted the “National Strategy for the European Copernicus Programme” in 2017. This strategy was updated in 2024 with the „ National User Uptake Strategy for …

  • Article from 15.06.2020 | Last changed: 24.06.2020

    Examples of Good Practice In Natech Risk Management

    … Several sources of information were used for researching the cases.  A survey in 2017 among OECD- and Non-OECD-countries asked for 16 possible areas in which … the UN / OECD Natech II project.   Associated content Links Natech Risk Management: 2017 – 2020 Project Results Natech Risk Assessment and Management RAPID-N: Rapid … Several sources of information were used for researching the cases.  A survey in 2017 among OECD- and Non-OECD-countries asked for 16 possible areas in which …

  • Article from 15.06.2020 | Last changed: 16.07.2020

    Natural Hazards Triggering Technical Accidents (Natech)

    Lightning and technical installation

    … like the earthquake and tsunamis 2011 in Japan and the devastating hurricane Harvey 2017 in the USA, make aware that natural hazards not just cause destruction of … first OECD Natech project.  A second survey on Natech Risk Management was made in 2017. This survey included new questions and some from the first survey. The later … on the results of the second UN / OECD Natech Projekt “ Natech Risk Management: 2017 – 2020 Project Results ” Associated content Links Second Addendum to OECD …

  • Article from 31.07.2020 | Last changed: 20.11.2025

    Non-Chemical Alternatives for Rodent Control (NoCheRo)

    Die Silhouette einer Ratte vor grünem Hintergrund

    … are considered as candidates for substitution under the BPR. Nevertheless, in 2017, the approval of all anticoagulant active substances was renewed for another … are considered as candidates for substitution under the BPR. Nevertheless, in 2017, the approval of all anticoagulant active substances was renewed for another …

  • Article from 27.01.2025 | Last changed: 27.01.2025

    CCE Status Reports

    Status Report

    … deposition of nitrogen and sulfur and progress in dynamic modeling. Reports until 2017 have been published by the Dutch National Institute for Public Health (RIVM), where the CCE was located from 1990 until 2017. The CCE Status Report 2025 is currently in progress. Status Report 2022 Status Report 2017 Status Report 2015 Status Report 2014 Status Report 2012 Status Report 2011 …

  • Article from 22.02.2024 | Last changed: 19.05.2025

    German Environmental Survey, GerES VI (2023-2024)

    a colorful picture with many different faces

    … possible to volunteer for GerES VI. After GerES IV (2003–2006) and GerES V (2014–2017) investigating exclusively children and adolescents, the focus is now again on … possible to volunteer for GerES VI. After GerES IV (2003–2006) and GerES V (2014–2017) investigating exclusively children and adolescents, the focus is now again on …

  • Article from 15.05.2020 | Last changed: 18.05.2020

    Active Pharmaceutical Ingredients (API)

    … popular painkiller in Germany. Measurements were taken at 48 monitoring stations in 2017. Monitoring sites mainly affected by discharges from municipal wastewater … measuring sites at which the national monitoring program was carried out in 2017. Draft of annual average - AA-EQS and PNEC of active pharmaceutical … popular painkiller in Germany. Measurements were taken at 48 monitoring stations in 2017. … Synthetic hormones such as 17-Alpha-ethinylestradiol (EE2), an active …