Large scale ecological projects

Major projects

Locations of major projects
Quelle: Frauenstein

Under the unification treaty that was concluded with the former East Germany, the Federal Republic of Germany took possession of the former East Germany’s assets and assumed liability for its debts. As a result, the entirety of the former East Germany’s industrial sector and its contaminated sites also became the responsibility of the Federal Republic of Germany.

10.08.2020

Large scale ecological projects

In December of 1992, the federal government and the Treuhandanstalt (THA, Fiduciar Agency) concluded the Verwaltungsabkommen über die Regelung der Finanzierung der ökologischen Altlasten (VA-Altlastenfinanzierung) agreement with the regional states of Berlin, Brandenburg, Mecklenburg-West Pomerania, Saxony, Saxony-Anhalt and Thuringia, concerning joint financing of contaminated-site remediation projects. The goal of the agreement was to eliminate site contamination as an impediment to investment, create jobs, and retain existing jobs.
Under the unification treaty that was concluded with the former East Germany at the time of German unification, the legal basis for contaminated-site remediation and the financing thereof at the federal and regional-states level comprises statutory obligations toward investors pursuant to the site contamination provisions of the various privatization agreements.

On request, the relevant regional-state authorities exempted investors from legal responsibility for the costs attributable to environmental damage that occurred prior to 1 July 1990, pursuant to the Umweltrahmengesetz and Hemmnisbeseitigungsgesetz laws.

The federal government and regional states agreed to undertake 21 large scale ecological projects, based on economic and environmental policy. These projects involved major industrial concerns, potassium mining companies, and shipyards, as well as large industrial regions containing numerous companies.

The technical aspects of the projects were hammered out by project working groups, whose sessions were also attended by BvS representatives, regional-state environmental officials, and ⁠UBA⁠ representatives. All measures had to be green-lighted by both federal and regional-state authorities.

Between 1993 and 2011, more than €2.6 billion in refinancing was provided for hazard prevention measures, demolition measures and contamination related expenses for large scale ecological projects (75 per cent funded by the federal government, 25 per cent funded by the regional states, after subtracting investor contributions), as well as for so called regular financing (60 per cent funded by the federal government, 40 per cent funded by the regional states, after subtracting investor contributions) (Source: BvS).

The federal government’s goal is to reach an agreement with the regional states concerning cost sharing for hazard prevention measures, and define and contractually stipulate (in conjunction with assignment of responsibility to the regional states) the federal government’s role in the required measures. The regional states of Thuringia, Saxony, Saxony-Anhalt and Mecklenburg-West Pomerania have concluded an agreement with the federal government in this regard and now make all of their own decisions concerning the nature and scope of cleanup measures.

Insofar as fiduciary tasks have not already been assigned to other parties, the BvS contracts out these tasks (apart from those that fall to the authorities). Gesellschaft zur Entwicklung und Sanierung von Altstandorten mbH (GESA) is a wholly owned subsidiary of BvS and carries out site cleanup operations for BvS.

Opencut mining residual hole

Flooded opencut mining residual hole
Exploitation in opencut mining leaves mining hollow patterns behind, that fill with groundwater due to mass deficit.
Quelle: Frauenstein

Opencut mining residual lake

Quality of surface water in opencut mining residual lakes
The pH-values in the opencut mining residual lakes in Lusatia are between 2 und 3,5 after raise of the groundwater caused by sulphide weathering.
Quelle: Frauenstein

Mobile neutralization

Special vessels are used for neutralization of opencut mining residual lakes
Quelle: Frauenstein

Cleaning plant for mine drainage water

Neutralization plant for treating wry mine drainage water
The picture shows a plant for treating wry mine drainage waters.
Quelle: Frauenstein

Neutralized opencut mining lake

Opencut mining lake after water treatment through neutralization
Quelle: Frauenstein

Inlet structure

Inlet structure of "Weiße Elster", opencast mining Zwenkau
Quelle: Frauenstein

Feeder of waters

Dimensioning of artificial feeder
The picture shows the constructed feeder to an opencast mining residual lake after inlet structure.
Quelle: Frauenstein

Canoe-park

Canoe-park "Markleeberg"
Canoe-park "Markleeberg" developed out of the remediation of mining in the lake country around Leipzig.
Quelle: Frauenstein

Brown-coal mine site cleanup

Apart from large scale ecological projects, Annex 3 of VA-Altlastenfinanzierung governs brown-coal mine site cleanup, which is Germany’s largest interconnected environmental project. The relevant measures are determined by the federal government and the regional states of Brandenburg, Saxony, Saxony-Anhalt and Thuringia, via the Steuerungs- und Budgetausschuss Braunkohlesanierung (StuBA) committee, which is co-chaired by the Federal Finance Ministry (BMF) and the Federal Ministry for the Environment (⁠BMU⁠). Lausitzer und Mitteldeutsche Bergbau-Verwaltungsgesellschaft (LMBV) acts as project owner.

Until 2020 more than €11,43 billion in federal and regional-state funds have been budgeted for brown-coal cleanup projects, predominantly for coal mine cleanup measures and extensive water management projects.

The main measures are as follows:

  • Ending mining site monitoring by carrying out the hazard elimination and statutory site repurposing activities mandated by the relevant plan
  • Restoration of a largely self sufficient and self regulating water balance
  • Infrastructure development; permanently assigning the relevant tasks and responsibilities

Publikationen

  • Inventarisierung von Grundwasserschäden und deren Beurteilung in Großprojekten "Ökologische Altlasten" der neuen Bundesländer
  • Prognose und Handlungsbedarf zur Altlastensanierung auf durch Braunkohlebergbau beeinflussten Flächen
Artikel:

Schlagworte:
 financing of inherited waste  exemption of inherited waste  remediation of inherited waste Top

„Für Mensch und Umwelt“ ist der Leitspruch des ⁠UBA⁠ und bringt auf den Punkt, wofür wir da sind. In diesem Video geben wir Einblick in unsere Arbeit. 

Umweltbundesamt

Kontakt

Wörlitzer Platz 1
06844 Dessau-Roßlau
Bitte richten Sie Ihre Anfragen ausschließlich über das Kontaktformular "UBA fragen" an uns.
Infolge der großen Anzahl von Anfragen kann es bei der Beantwortung zu Verzögerungen kommen. Wir bitten um Verständnis.

Quelladresse (zuletzt bearbeitet am 28.04.2023):https://www.umweltbundesamt.de/node/24627