Umweltbundesamt

Home > Exemplary investigation into the state of practical realisation of integrated environmental protection with regard to large combustion plants in Germany

Wirtschaft | Konsum

Exemplary investigation into the state of practical realisation of integrated environmental protection with regard to large combustion plants in Germany


A central element to implement the IPPC-Directive (Council Directive 96/61/EC) consists in the information exchange on an European level on the “Best Available Techniques” BAT for all industrial activities listed in Annex 1 of the Directive. Technical Working Groups (TWG) are set up to facilitate the exchange of information under Article 16.2 of the Directive. The first TWG on large combustion plants (LCP - combustion installations with a rated thermal input exceeding 50 ⁠MW⁠) was held on 24 and 25 February 2000 at the European IPPC Bureau (EIPPCB) in Sevilla. The aim of this working group is the elaborate a Reference Document on BAT (here: ⁠BREF⁠) for this sector.  

Downloaden
Seitenzahl
191
Erscheinungsjahr
November 2002
Autor(en)
O. Rentz, K. Gütling, U. Karl
Sprache
Englisch
Andere Sprachen
Deutsch
Forschungskennzahl
200 46 317
Verlag
Umweltbundesamt
Dateigröße
1628 KB
Preis
0,00 €
Druckversion
nicht lieferbar
Artikel:

Schlagworte:
 BREF  large combustion plant  operating experience  IPPC Directive  environmental pollution  best available technology

„Für Mensch und Umwelt“ ist der Leitspruch des ⁠UBA⁠ und bringt auf den Punkt, wofür wir da sind. In diesem Video geben wir Einblick in unsere Arbeit. 

Umweltbundesamt

Kontakt

Wörlitzer Platz 1
06844 Dessau-Roßlau
Bitte richten Sie Ihre Anfragen ausschließlich über das Kontaktformular "UBA fragen" an uns.
Infolge der großen Anzahl von Anfragen kann es bei der Beantwortung zu Verzögerungen kommen. Wir bitten um Verständnis.

Quelladresse (zuletzt bearbeitet am 14.06.2013):https://www.umweltbundesamt.de/publikationen/exemplary-investigation-into-state-of-practical-0